Step 1: Drill only the ports which are to be used in the installation. Port sizes and recommended drill diameters are shown in Figure 3 for 8ltr (2.1 US Gals) tank.
Ensure all swarf is removed from inside the tank after drilling.
Inlet
Inlet
INLET
INLET
25mm (1")
25mm (1")
25mm (1")
25mm (1")
19mm (3/4")
19mm (3/4")
16mm (5/8")
16mm (5/8")
8ltr (2.1 US Gals) Grey
OUTLET
Waste Tank Models
19mm (3/4")
19mm (3/4")
Front End
14mm (9/16")
12.5mm (1/2")
Step 2: The tank must be secured using 4 appropriate screws, through the feet of the tank as shown in Figure 4. NOTE: The angle of the tank must not exceed 10°
(Figure 5). NOTE: Do not screw directly to the hull – MUST be mounted on a bulkhead or an additional board.
x4 screws
Figure 4 Securing The Tank
Step 3: Rotate the head of the pump to suit the installation, and avoid tight bends in the pipe. Ensure that the screws are retightened after rotating the pump head.
Inlet
Inlet
INLET
INLET
25mm (1")
19mm (3/4")
25mm (1")
19mm (3/4")
19mm (3/4")
16mm (5/8")
14mm (9/16")
12.5mm (1/2")
Outlet
Figure 3 Port Sizes & Recommended Drill Diameters For 8ltr (2.1 US Gals) Grey Waste Tank