Eaton Cooper Lighting FHL Serie Instrucciones De Instalación Y Mantenimiento página 2

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions – FHL Series Industrial LED Lighting
INSTALLATION
Mounting
1.
Mount the cover module in its support position.
Ceiling and wall mount: mark and drill desired location on
mounting surface. Secure with 1/4" (6mm) bolts or lag
screws (not provided).
Pendant, stanchion mount: securely thread onto the
appropriate NPT size conduit. Tighten set-screw located in
the conduit hub (Figure 1.).
Cooper Crouse-Hinds HTL thread lubricant must be added
to the conduit threads to prevent water from entering the
fixture.
Wiring
1.
Pull field wiring into cover module.
2.
Close all unused conduit entries with conduit plugs provided.
To prevent galling, lubricate conduit plugs with Cooper
Crouse-Hinds HTL lubricant before installing. Tighten plugs
securely with at least five full threads engaged.
3.
Hang LED luminaire on the cover module hinge hook
(Figure 2.).
4.
Connect supply wires to luminaire wire leads per the
attached wiring diagrams using methods that comply
with all applicable codes (Refer Wiring Diagram).
Tighten all electrical connections.
5.
Close driver housing onto cover module, making sure
that all wires are safely inside driver. Tighten captive
closing screw to 30 in -lbs (3.4 N-m).
6.
Turn power on.
Field Assembled Fixtures
FHL Series Lighting Fixtures, 50-140 Watt. Complete lighting
fixture consists of cover, LED luminaire (Figure 3.).
Pendant
PR75 3/4IN.
PR10 1 IN.
PFL75 3/4 IN.
NPT
1
Entries
Figurt 3.
2
Wall
Ceiling
WT75 3/4 IN.
C75 3/4 IN.
WT10 1 IN.
C10 1 IN.
DM1, DM2, DM3, DM4
FHL9L/7L/5L
FHL3L/11L
5
InsoallaoiNn InsorucoiNns – FHL Strits Indusorial LED Lighoing
IF 1628 FS
ADC140281
Set Screw
Figurt 1.
Figurt 2.
Stanchion
S25D15
1 1/2 IN.
5
1
www.eaton.com
Open Hinge
Ground Wires
SS15
1 1/2 IN.
1

Publicidad

Tabla de contenido
loading

Tabla de contenido