LEGRAND 310954 Manual Del Usuario página 12

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5. Connect the battery charger to the battery bank through the DC cable L1 or L2 (picture 4,5).
Picture 4 - Daker DK
6. Keor S : Ensure the installation is safe for the final user applying to the battery cabinet terminal
block insulating cover and cables glands.
7. Plug the power cable to the AC mains socket.
8. Switch on the battery banks breakers.
9. Turn on the mains that supply UPS, battery banks and battery chargers.
CAUTION
Before to uninstall the battery charger switch off the mains and the battery banks and en-
sure no dangerous voltage is present in the terminal block. No matter the charger is con-
nected to the utility or not, the output may have electricity.
12
3 Installation
Picture 5 - Keor S

Publicidad

Tabla de contenido
loading

Tabla de contenido