Descargar Imprimir esta página

Set Up Procedures; Parts List - Mi-T-M Corporation AW-7020-8003 Guia De Inicio Rapido

Publicidad

Idiomas disponibles

Idiomas disponibles

SET UP PROCEDURES

We recommend that
1
you first fit the lower
portion of the han-
dle into the mounting
brackets on the cover
and secure with the
bolts or the pins & clips.
Next, tighten the swivel
4
end of the hose with a
wrench into the top of
the rotary head until
snug.
** Note that lowering the head too far may result in the rotary arm hitting the surface and damaging it.
TROUBLE SHOOTING
Rotary Arm doesn't spin:
1
• Remove, inspect and clean nozzles.
Replace if damaged
• Ensure there is no water leaking
excessively from the weep holes on
the rotary head (water will normally
seep out of these holes).

PARTS LIST

6
5
4
14
8
2
1
14
10
The rotary head has a six-month warranty from the date ofpurchase. Should you encounter problems with the rotary head
within that time period, simply return the defective part for warranty to the place of purchase.
There is no warranty on the nylon brush ring.
All other components of the surface cleaning system have a 90-day warranty against manufacturer's defects only.
2
5
Ref. # Description
1
Collar
9
2
Rotary Head*
3
Mounting Blocks
4
Hose, 62" x 3/8"
5
Spray Gun
6
Q/C Plug, 3/8" MNPT
7
7
Handle, Upper
8
Handle, Lower
3
14
14
11
Next, tighten the
"fixed" hose end into
the gun mounted onto
the upper portion of the
handle. Use teflon tape
on the hose ends and
tighten with a wrench
until snug. Do not
overtighten.
Turn the cover over
and check to ensure
that the nozzle tips are
securely tightened and
the spray pattern is in
line with the rotary arm.
2
AW-7020-8003
Part #
Qty.
Ref. # Description
33-0534
1
33-0535
1
56-0072
2
15-0326
1
16-0465
1
17-0074
1
7-0235
1
7-0236
1
WHIRL-A-WAY ROTARY HEAD BREAKDOWN
Hose connection inlet
Grease nipple
Stainless steel spring
13
Viton O-Ring (25-0677)
Stainless steel sleeve
Stainless steel inlet valve
with Carbide seat (22-0488
12
includes oring)
Viton O-Ring (25-0678)
Viton O-Ring (25-0679)
Stainless steel bearings
Aluminum housing
Stainless steel rotating shaft
WARRANTY
Once this is complete,
3
join the two sections of
the handle together and
secure with the bolt or
the pin & clip.
The factory presets the
6
height of your rotary
head from the ground
based on peak perfor-
mance. If you choose to
lower or raise the height
of the head, loosen the
tension bolt in the collar.
Leaves striping:
• Ensure nozzles aren't damaged or
plugged.
• Ensure rotary arms are straight.
• Ensure nozzle groove is in align-
ment with arm.
9
Hand Grip
10
Brush Skirt
11
Cover
12
Rotary Arm
13
Nozzle, 25 Deg. 025
14
Pin and Ring Set
*
Head Rebuild Kit
Part #
Qty.
7-0237
1
33-0536
1
33-0537
1
33-0538
1
18-0299
2
43-0140
1
70-0598
1

Publicidad

loading