Important - Liberty Pumps 2448 Serie Manual De Instalación

Sistemas trituradores simplex
Ocultar thumbs Ver también para 2448 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

D. Alarm:
RISK OF ELECTRIC SHOCK
WARNING
 Pump shall be properly grounded using its supplied
grounding conductor. Do not bypass grounding wires
or remove ground prong from attachment plugs.
Failure to properly ground the pump system can cause
all metal portions of the pump and its surroundings to
become energized.
 All electrical and safety practices shall be in accordance
with the National Electrical Code
Safety and Health Administration, or applicable local
codes and ordinances.
IMPORTANT: The alarm panel, as an integral part of this
complete unit, is supplied with its own separate
Installation/Operation/Maintenance manual. Ensure receipt
of this manual, and that it is read and understood prior to
installing this unit. Familiarity with the plugger box manual
is critical.
A separate 115V branch circuit is required for the alarm
circuit. Do not split the incoming pump power circuit to
power the control circuit.
Connect the grinder pump leads and the float switch
leads to the plugger box in accordance with the
instructions included with those units.
E. Float Switches: The pump cycle is preset at the factory
at 7" (approximately 13.5 gallons). The pump cycle can
be adjusted by loosening the cord grip and moving the
"on" float up or down. Adjustments of more than 3" in
either direction are not recommended—call customer
service if the pump cycle needs to be adjusted beyond
this recommended level.
F.
Testing and Startup: Follow the testing and startup
procedures found in the pump and plugger box
manuals.
G. GR20 Guide Rail Assembly: The GR20 quick
disconnect assembly provided with the grinder
package system is designed to allow easy installation
and removal of the pump. Ensure that installation is
done per Figure 2 and Figure 3.
– 6 –
®
, the Occupational
Copyright © Liberty Pumps, Inc. 2018 All rights reserved.
Ensure grommet
is properly
greased and
installed.
Ensure GR20 base is bolted
down to bottom of tank.
1/2" SS bolts are recommended.
Ensure rubber grommet is properly
installed and greased here.
Figure 2. Installation Tips
Install 3/8-16 hex bolts here.
Tighten both sides evenly so
that gasket is properly
compressed.
7386000K

Publicidad

Tabla de contenido
loading