Publicidad

Idiomas disponibles

Idiomas disponibles

Enlaces rápidos

LIEBERT® ITA2™ UPS
Quick Installation Guide
IMPORTANT: Before installing,
connecting to supply or operating
your Liebert ITA2 UPS, please
review the Safety and Regulatory
Statements sheet. For detailed
installation, operating, maintenance
and troubleshooting information
visit the ITA2 product page for the
ITA2 UPS Installer/User Guide
available at www. V ertivCo.com or
use the QR code below.
Table 1 Liebert UPS currents and cables — User and UPS rectifier input
Maximum Input
Unit Rating
Current (A)
8 KVA
10 KVA
Table 2 Liebert UPS currents and cables — User and UPS bypass input and output
Maximum Input
Unit Rating
Current (A)
8 KVA
10 KVA
Table 3 Ring terminal part numbers
McMaster-Carr: 7113K462
Part Number
Thomas & Betts: RC10-14
Tyco Electronics: 1577648-1
Unpacking and Inspection
Unpack and inspect the UPS and
its accessories. If damage is visible,
do not proceed. File a damage
claim with the carrier immediately
and send a copy to:
Vertiv Corporation
1050 Dearborn Drive
P.O. Box 29186
Columbus, Ohio 43085 USA
Selecting Power Cables
When connecting wiring, follow the
local wiring regulations, and take the
environment situation into account.
NOTE: The conduit size and wiring
method must be in accordance
with all local, regional and national
codes and regulations, including
NEC ANSI/NFPA 70.
The maximum current for operating
modes, the recommended wire
sizes, and the recommended power
cables and plugs are listed in Tables
1 to 3, below.
Recommended
OPD
24
30A
37
50A
Recommended
OPD
23
30A
28
40A
10 AWG (5.26 mm
)
2
75°C THW
75°C THW
Copper Wire
Copper Wire
(phase)
(neutral)
*Number of Cable
* Number of Cable:1
per phase:1
8 AWG
8A WG
6 AWG
6 AWG
75°C THW
75°C THW
Copper Wire
Copper Wire
(phase)
(neutral)
10 AWG
10 AWG
8 AWG
8 AWG
8 AWG (8.36 mm
)
2
McMaster-Carr: 7113K444
Thomas & Betts: RDV717
Tyco Electronics: 132331-1
Prepare for Connections
For all configurations:
• Remove the conduit box cover
to gain access to the input and
output terminal blocks.
• Remove the knockout plates
and attach the conduits to the
rear of the conduit box.
Single-input Configuration
Connections
1. Leave the shorting busbars in
place on the UPS input terminal
block.
2. Referring to the "Single-Input
terminal block" in the Wiring
Diagram on the next page,
connect the cables from the
upstream feeder panel:
– Phase A to L1
– Phase B to L2
– Phase C to L3
– Neutral to N
– Ground to PE (next to pA)
75°C THW
Copper Wire
Recommended
(Ground)
* Number of Cable: 1
10 AWG
10 AWG
75°C THW
Recommended
Copper Wire
(Ground)
10 AWG
10 AWG
6 AWG (13.3 mm
McMaster-Carr: 7113K366
Thomas & Betts: RE6-14
590-2145-665A/SL-26255QS_REV2
Torque
30 lb-in
30 lb-in
Torque
30 lb-in
30 lb-in
)
2
1

Publicidad

Tabla de contenido
loading

Resumen de contenidos para Vertiv LIEBERT ITA2 UPS

  • Página 1 IMPORTANT: Before installing, connecting to supply or operating Unpack and inspect the UPS and For all configurations: your Liebert ITA2 UPS, please its accessories. If damage is visible, • Remove the conduit box cover review the Safety and Regulatory do not proceed. File a damage to gain access to the input and Statements sheet.
  • Página 2: Output Connections

    LIEBERT® ITA2™ UPS Quick Installation Guide Wiring Diagram Output terminal block Single-Input Single-Input terminal terminal block block BAT- BAT+ BATN Dual-Input terminal block Output Connections POWERING THE UPS Dual-input Configuration Connections NOTE: The UPS has two output NOTE: Do not start the UPS until 1.
  • Página 3 LIEBERT® ITA2™ UPS Quick Installation Guide 3. Power-on the UPS using the Operation and Display Panel Operation and Display Panel by pressing the power button until the confirmation dialog appears. Use the Up/Down Escape arrows to select “YES”, then press Enter. Alarm NOTE: During operation, the UPS may sound an alarm.
  • Página 4 To contact Vertiv Technical Support: visit www.VertivCo.com © 2019 Vertiv Co. All rights reserved. Vertiv and the Vertiv logo are trademarks or registered trademarks of Vertiv Co. All other names and logos referred to are trade names, trademarks or registered trademarks of their respective owners. While every precaution has been taken to ensure accuracy and completeness herein, Vertiv Co. assumes no responsibility, and disclaims all liability, for damages resulting from use of this information or for any errors or omissions.
  • Página 5: Desembalaje E Inspección

    Preparación de las funcionamiento, mantenimiento y Vertiv Corporation conexiones solución de problemas, visite la página 1050 Dearborn Drive Para todas las configuraciones: del producto ITA2 para consultar la Código postal 29186...
  • Página 6: Conexiones De Salida

    UPS LIEBERT® ITA2™ Guía de instalación rápida Diagrama de cableado Bloque de terminales de salida Bloque de terminales de una sola entrada BAT- BAT+ BATN Bloque de terminales de entrada doble en el Diagrama de cableado de 3. Para la entrada de la derivación, –...
  • Página 7 UPS LIEBERT® ITA2™ Guía de instalación rápida 2. Cierre todos los disyuntores Panel de operación y descendentes, incluido el visualización disyuntor principal del panel de distribución y/o los disyuntores del circuito derivado y, si están Escape Funciona- incluidos, los disyuntores de miento distribución de un POD.
  • Página 8 Para ponerse en contacto con el servicio de asistencia técnica de Vertiv, visite www.VertivCo.com. © 2019 Vertiv Co. Todos los derechos reservados. Vertiv y el logotipo de Vertiv son marcas comerciales o marcas registradas de Vertiv Co. Todos los demás nombres o logotipos mencionados son marcas comerciales o registradas de sus respectivos propietarios.
  • Página 9: Déballage Et Inspection

    ITA2 transporteur et envoyez une copie à : Pour toutes les configurations : pour obtenir le Guide d’installation et Vertiv Corporation • Retirez le couvercle de la boîte d’utilisation de l’ A SC ITA2 disponible 1050 Dearborn Drive de dérivation pour accéder aux...
  • Página 10: Raccordements De Sortie

    ASC LIEBERT ITA2 Guide d’installation rapide Schéma de câblage Bloc de raccordement de sortie Bloc de raccordement à entrée unique BAT- BAT+ BATN Bloc de raccordement à double entrée page suivante, branchez les 3. Pour l’entrée de dérivation, – Phase A de A (pA) à la câbles provenant du tableau reportez-vous au « Bloc de Phase A sur le panneau...
  • Página 11 ASC LIEBERT ITA2 Guide d’installation rapide en amont pour la dérivation Panneau de fonctionnement et d’affichage de l’ A SC. 2. Fermez tous les disjoncteurs en aval, y compris le disjoncteur principal du panneau de Échap distribution et/ou les disjoncteurs Marche de dérivation et, le cas échéant, Haut Alarme...
  • Página 12 Pour contacter l’équipe d’assistance technique de Vertiv, consultez le site www.VertivCo.com. © 2019 Vertiv Co. Tous droits réservés. Vertiv et le logo Vertiv sont des marques de commerce ou des marques déposées de Vertiv Co. Tous les autres noms et logos mentionnés sont des noms commerciaux, des marques de commerce ou des marques déposées de leurs détenteurs respectifs.

Tabla de contenido