Carrier 30 Cart and Carrier 40 Cart
STEP 4 - Installing the Security Chain Kit.
Tools required:
•
Masonry hammer-drill
•
10mm masonry drill bit
•
Pencil and ruler/tape
•
Hammer
•
13mm and 17mm spanners
Move the Trolley to where you intend to store and secure it. It is best if the Floor Plate is as close as possible
to a wall to reduce the hazard of tripping and injury.
Attach the end of the chain to the steel loop with the padlock and position the plate end in the desired
position on the floor.
(NOTE: If mounting on carpet you will need to cut out the carpet from the area where the floor plate
attaches, otherwise the carpet will wrap around the drill when drilling).
Mark the center of each of the
3 holes, using the floor plate as
a guide.
Now undo each of the three nuts, and in their
place thread on the three silver shear-nuts.
Ensure that the 'cone' is down and the hexagonal
nut is up. Using the 17mm spanner tighten down
the three shear nuts until the hexagonal 'head'
shears off, leaving just the cone 'base'.
Attach the security chain through the steel loop
under the side of the trolley using the padlock.
The Security Chain Kit contains the following:
•
•
•
•
Drill a 10mm hole through each
of the 3 marked centers to a
depth of 50mm.
1 x 3 holed Anchor Plate and security chain
3 x 55mm long, 8mm Anchor Bolts
3 x Shear Nuts and washers
1 x Lock and key set
Insert the anchor bolts with nut
attached into the holes through
the floor plate. Using the 13 mm
spanner, progressively tighten
down each of these anchor nuts
so that all three bolts are firmly
anchored into the concrete.