Liberty Pumps Ascent II-ESW Manual De Instalación página 10

Ocultar thumbs Ver también para Ascent II-ESW:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4-3-2
Discharge and Vent Flanges:
Both the discharge and vent flanges are fastened to the main
cover and can be removed by unscrewing the four fasteners
and pulling the flange away from the main cover.
4-3-3
Check Valve:
The discharge flange has an integrated check valve. The valve is held in place by a support backing plate that is also
connected to the discharge hose. To access the check valve, first remove the discharge flange from the main cover by
removing 4 screws. Then, remove the hose followed by the two screws. The hose nipple can then be separated from the
flange by pulling it outward. The check valve snaps onto the hose nipple. When reinstalling, the hinge of the check valve
must be aligned with the "notch" in the hose nipple or backing plate. After installation of the hose nipple, confirm the check
valve opens completely.
©Copyright 2012 Liberty Pumps Inc. All rights reserved.
10

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Ascent ii-rsw

Tabla de contenido