Mp 2Xxx Dvi / Mp 5Xxx Dvi / Mp 9Xxx Dvi - Lenze L-force MP 800 DVI Serie Instrucciones Para El Montaje

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

4.4.2

MP 2xxx DVI / MP 5xxx DVI / MP 9xxx DVI

Control board mounting
How to perform the installation:
1. Prepare the control board by cutting the mounting cutout and drilling the
mounting holes into it (¶ 31).
2. Check that the gasket under the front panel is located correctly.
3. Place the device in the mounting cutout, secure it by hand against falling
down and screw the nuts and washers onto the threaded bolts.
4. Fit all screw clamp fixings as explained below:

Insert the screw clamp fixing into the slot in the housing of the device
(see above figure).
Press the screw clamp fixing downwards, tilt it towards the housing
and check that it has firmly snapped into place.
Tighten the screw clamp fixing hand−tight with a screwdriver.
5. Check that the device is securely located in the mounting cutout and that
the front panel gasket is located correctly.
If necessary, realign the device/gasket.
If the gasket is not located correctly, protection class IP65 is not
achieved on the front of the device!
MA_ELx0xx DE/EN/FR/ES/IT 2.0
MP 2xxx DVI / MP 5xxx DVI / MP 9xxx DVI
l
Installation
Mounting steps
ƒ
ELx7xx−012
4
33

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

L-force mp 9000 dvi serie

Tabla de contenido