TWIN/FULL BUNK BED
DL1008TFBB-1, DL1008TFBB-2
10
STEP 8
Insert wood dowel (7) into each end of the short guardrails (N).
Attach two short guardrails (N) to short guardrail post (H) with wood joint connectors (3).
Fasten two short guardrails (N) to top post (A) with wood joint connectors (3).
Fasten the short guardrail post (H) to front side rail (I) with joint connectors (10) and hex
caps (11) as shown.