Power Wiring Interconnections - Briggs & Stratton 071013 Manual De Instalación Y Operador

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Power Wiring Interconnections

All wiring must be the proper size, properly supported and
protected by conduit. All wiring should be done per
applicable federal, state and local codes, standards and
regulations.
Complete the following connections between the transfer
switch, power management system and main breaker panel.
Also see the Wiring Decal on page 8.
WARNING
Low voltage wire cannot be installed in same
conduit as power voltage wiring.
• Failure to follow above warning could cause personal injury,
damage and/or malfunction of equipment.
1. Set generator's system switch to OFF position.
2. Set generator's main circuit breaker to OFF (open)
position.
3. Identify loads and their priorities (using list developed
with owner) to be transferred to power management
system in main breaker panel.
4. In main breaker panel, turn selected load circuit
breakers to OFF position.
Relay Board
Load
Connection
Wireways
Generator
Connection
To Transfer Switch
NOTICE
Improper installation can cause damage to the circuit
boards and shorten their life. Installing circuit boards in live
circuits will damage the board and is not a warranty
condition. ALWAYS disconnect ALL sources of power prior
to servicing.
• Remove all power prior to installing this power management
system. Failure to do so could cause internal damage to the
board when making electrical connections.
• Turn generator to OFF position.
• Turn off utility power to the home standby generator and transfer
switch.
5. Connect "GND" lug to an approved ground.
NOTE: Assure grounding electrode conductor is connected
and bonded per applicable federal, state and local codes,
standards and regulations.
6. Using installer supplied 300VAC or greater wire and
supplied 1/4" double male, single female lugs, connect
generator 240VAC from transfer switch to relay board
in power management system.
7. Unplug current transformers from control module in
transfer switch.
To Air Conditioners
Green LED's
Control
Module
Test
Button
Transfer Switch
Connections
Air Conditioner
Relays
Air Conditioner
Connections
Ground Lug
5

Publicidad

Tabla de contenido
loading

Tabla de contenido