Before Startup
Remove all packaging material except
the wooden palette.
Installing the pushing handle
Insert the pushing handle in the grooves
on the appliance.
Fasten the pushing handle with the 4
screws enclosed in the packet.
Fasten the covering flaps.
Hang in the strain relief clamp at the
pushing handle.
Unloading
Lock the rear wheels; remove the wood-
en blocks used for stopping the wheels.
Four indicated floor boards of the pallet
are fastened with screws. Unscrew
these boards.
Place the boards on the edge of the pal-
let. Place the boards in such a way that
they lie in front of the four wheels of the
machine. Fasten the boards with screws.
Slowly push the machine down from the
ramp.
Removing anti-frost agents
Note
At the time of manufacturing the appliance,
it has already been flused using an anti-frost
agent. Before starting the machine for the
first time, you need to first remove the anti-
frost agent.
Fill in 10 litres of fresh water in the fresh
water reservoir.
Press the foot pedal.
Set the machine switch to basic clean-
ing.
Keep the machine running until the pres-
sure on the manometer falls.
Start up
Preparing the travellator/ escalator
Danger
Risk of injury! The appliance can get stuck
and be dragged away by the travellator/ es-
calator. Before starting cleaning, check the
stepping areas and the ridge profile to see
that there are no deformations or any ob-
jects stuck therein. To be on the safer side,
make sure that you know where the emer-
gency switch-off button of the travellator/ es-
calator is located.
Cordon off the travellator/ escalator as
long as cleaning operations are on and
the stepping areas are still wet.
Switch on the travellator/ escalator.
Ensure that the running direction of the
travellator/ escalator is away from the
machine.
Preparing the appliance
Check whether the combs and the guide
rails of the machine match the make of
the travellator/ escalator. Replace the
combs and the guide rails, if required.
9
English