®
Worksurface Installation for Underworksurface Pedestals and Laterals
1.
Remove all drawers (see page 2).
2.
Place worksurface over the lateral or pedestal. Secure worksurface to the lateral
or pedestal with four (4) screws supplied.
NOTE: Front edge of the worksurface overhangs the front of the lateral or pedestal
approximately 1/8". When the worksurface is correctly positioned over the lateral or
pedestal, drilling 1/8" diameter pilot hole will ease the attachment of the screws.
NOTE: Pedestal filler available to fill gap between
back of pedestal and front of
panel.
3.
Reinstall all drawers (see page 3).
(4) #14
WOOD
SCREW
NOTE: Make sure worksurface
is level when
NOTE: Worksurface must be flush
to 1/8" from drawer front. If used
with kick freestanding desks, see
WORKSURFACE
kick freestanding desks assembly
direction 939503257.
LATERAL
finished.
1/8"
NOTE: Make sure worksurface
is level when
WORKSURFACE
NOTE: Worksurface must be flush
(4) #14
WOOD
to 1/8" from drawer front. If used
SCREW
with kick freestanding desks, see
kick freestanding desks assembly
direction 939503257.
PEDESTAL
finished.
1/8"
Page 4 of 57
P/N 939504734
Doc # 70305 Rev J