Commissioning; Before Commissioning; Before Operation - Wetrock Discomatic Samba XT Instrucciones De Manejo

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 44
5

COMMISSIONING

5.1

Before commissioning

Before commissioning / Initial commissioning
Delivery, or instructions on safety regulations, handling and maintenance, in addition to initial commissioning, are normally undertaken
by an approved expert. If this is not the case, the operating company is responsible for instructing the operator.
Items of jewellery, such as rings and chains, must be removed.

Before operation

1
Connect battery cables.
LED indicator at charger while charging
Fully charged.
Loading almost completed (approx. 20 min.).
LED indicator at operating lever while using
Fully charged.
Remaining battery capacity at approx. 30 %.
Is illuminated
Flashes
2
Recharge battery (approx. 6 hrs.).
The battery is fully charged,
when the green light is on.
Battery is loading.
Battery almost low, recharge immediately.
Battery low, machine is
switched OFF.
38

Publicidad

Tabla de contenido
loading

Tabla de contenido