Before You Start - Hoggar BERGEN II Manual De Instrucciones

Arcón metálico
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Use Manual
BEFORE YOU START - Owner's Manual
Prior to installation, it is important that you contact your local government authority to determine if building approval is required. Study and understand this owner's manual. Important information
and helpful tips will make your construction easier and more enjoyable.
Assembly instructions
Instructions are supplied in this manual and contain all appropriate information for your building model. Review all instructions before you begin. During assembly, follow the step sequence care-
fully for correct results .Please be aware: this unit takes two people about one full day to complete.
Parts
Check to be sure that you have all the necessary parts for the building.
Separate contents of the carton by the part number while reviewing parts list.
Familiarize yourself with the hardware and fasteners for easier use during construction. These are packaged within the carton. Note that extra fasteners have been supplied for your convenien-
ce.
Tools may required
Use heavy duty gloves when handling steel sheets and flashing
PLAN AHEAD
Watch the weather:
Please be sure the day you select for installation is dry and calm.
DO NOT attempt to assemble your shed in windy weather because of risk of damage to panels, or personal injury. Be careful of wet or muddy ground.
Teamwork:
Whenever possible, two or more people should work together to assemble the building. One person can position parts or panels. It requires two people a full while the other is able to handle the
fasteners and the tools.
day to complete installation
Site Selection
l Avoid overhanging trees as much as possible as leaves will make regular cleaning necessary and broken branches are a potential hazard.
l Small trees,bushes or fences nearby can be helpful,acting as a wind break.
Site Preparation
The site must be prepared so that the base of the shed is level all round and checking with a spirit level is required.
The base can be constructed by treated timber or concrete,in order to stop the moisture getting into the shed.The shed is not designed to be built onto
lawn directly.Also the ground will get muddy during rainy days.
If a concrete pad is made,it is important that this slopes towards the edges to prevent water ingress.
Time must be allowed for any concrete or cement to dry before building the shed on top.
Bases can also be constructed from bricks,blocks,or mounted on a concrete pad.
The bricks or blocks should be cemented onto firm and level concrete footings and the greenhouse frame drilled and
screwed to the base.
IMPORTANT NOTES:
l Find someone to help you:it is much easier with someone to hold parts,pass tools ect.Also some steps require two peo-
ple to lift structures together.This is not very heavy work so would suit most able-bodied people.
l Allow plenty of time:rushing often causes errors and the re-doing of incorrect assemblies.If you have never built a shed
before,it can take most of a day to carefully complete the construction.
l Have the right tools to hand. l Safety clothing as recommended in the 'Tools' section.
l Ideally lat out the parts and check that all are present before commencing construction.Lay on cloths or plastic sheets if
there is any risk of scratching the parts.
l Tighten all nuts carefully,being sure not to miss any.Check the frame is square and using a spirit level to check that it is
upright.

Publicidad

Tabla de contenido
loading

Tabla de contenido