1
Remove the complete lateral panelling.
Using a crane, place the upper half of
the casing onto the lower half.
2
When placing the upper half of the
casing, carefully guide the threaded rods
into the openings on the rotor blade and
the band clamps.
Do not damage the rotor
casing!
3065039_201804
Assembly of rotary heat exchanger
system
11