Equipment Specifications; Feed Water Chemistry Requirements - Watts OneFlow OF817-8H Manual De Instalación, Operación Y Mantenimiento

Ocultar thumbs Ver también para OneFlow OF817-8H:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Hot Water System Overview

Equipment Specifications

OneFlow
systems are complete, self-contained, loaded with media
®
and ready to use. A simple inlet and outlet connection is all that is
required for installation. Please review operating pressures, tempera-
tures and water chemistry limitations to ensure compatiblity.

Feed Water Chemistry Requirements

pH
Hardness (maximum)
Water Pressure
Temperature
Free Chlorine
Iron (maximum)
Manganese (maximum)
Copper
Oil & H2S
Polyphoshates
Silca (maximum)
WARNING
!
High levels of Copper will foul OneFlow media and typically origi-
nates from new Copper plumbing. Wait a minimum of 4 weeks
before placing system in operation. Avoid applying excess flux on
the inner surfaces of the pipe and to use a low-corrosivity water
soluble flux listed under the ASTM B813 standard.
NOTICE
OneFlow media does not reduce silica scaling. Silica can act as
a binder that makes water spots and scale residue outside the
plumbing system difficult to remove. This 20 ppm limitation is for
aesthetic purposes.
Dimensions
MODEL
OF817-8H, OF817-12H
a
20"
b
18.6"
c
8.5"
d
1.4"
e
10"
f
2.0"
g
6"
h
4.25"
NOTICE
The tank is only partially filled with media. The
tank is much lighter than a water softener and may appear to
be nearly empty. This is normal and necessary for the Upflow-
fluidized bed operation of the system.
Tank Head
Bypass Valve
(Shown in Bypass Position)
Media Tank
6.5-8.5
75 grains (1282 ppm CaCO3)
15 psi to 100 psi (1.03 bar to 6.9 bar)
100° F to 140° F (38°C to 60°C)
<2 ppm
0.3 ppm
0.05 ppm
1.3 ppm*
Must be Removed Prior to OneFlow
Must be Removed Prior to OneFlow
20 ppm**
OF1019H-20H
22"
20.6"
10.5"
1.4"
11"
2.0"
6"
4.25"
Figure 1.
CAUTION
!
• Do not let the system freeze. Damage to the tank may result.
• System must be operated in a vertical position. Do not lay
it down during operation. The system may be placed in any
position for shipping and installation but must be operated in
the vertical position.
• Must be used on hot water. This system is not designed for
cold (<100°F) water. For cold water operation contact your
dealer for a system designed for cold water operation.
g (clearance)
a
2
IN - Hot Water (100°-140°F)
OUT - OneFlow
Treated Water
®
d
b
c
e
f
h

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Oneflow of817-12hOneflow of1019-20h

Tabla de contenido