Installation Under Traffic Areas Up To Hgv60 - Graf ECO BLOC FLEX Instrucciones Para El Montaje

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

9.

Installation under traffic areas up to HGV60

Asphalt structure +
frost protection layer
Covering
EcoBloc
Inspect
system
Blinding
Traffic surfaces up to HGV60 should be structured according to prevalent guidelines. The blinding is
preferably made from gravel with a grit of 8mm/16mm and is 8-10 cm thick.
The EcoBloc Inspect system must be installed and connected in accordance with chapter 7. Ventilation
heads should be installed in green spaces.
9. Installation under traffic areas up to HGV60
28 / 60
H
acc. national
AS
standards
▼E
=45MN/m²
v2
H
R
▼E
=25MN/m²
v2
8-10cm

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

402005

Tabla de contenido