Descargar Imprimir esta página

Thermador VTN630 Manual De Instalación página 2

Publicidad

Idiomas disponibles

Idiomas disponibles

Integral Blower Installation
Integral Blower models VTN630 and VTN1030 are
integrated into the ventilation hood at the time of
installation.
Refer to the Installation Manual for important safety
instructions.
Use gloves when installing blower unit.
Suitable for the following hood models:
HOOD MODELS
PH30HS, PH36GS, PH36HS, PH54GS,
VCIB36JP, VCIN36JP, PH42GS, PH48GS,
PH48HS, VCIB48JP, VCIN48JP, VCIN54JP,
VCIB54JP
Installation Instructions
6
4
1/ 8
"
(175)
(105)
8
1/ 4
"
(210)
4
1/ 8
"
(175)
(105)
BLOWER
VTN1030
VTN630
1/ 4
8
" (210)
8
7/ 8
"
(225)
2
1/ 4
"
(57)
3/ 4
6
"
(171)
7/ 8
"
25"
(635)
Integral Blower Model VTN1030
8
7/ 8
"
(225)
25"
6
7/ 8
"
(635)
Integral Blower Model VTN630
1. The blower is attached to the hood using weld studs
provided on the mounting plate. Guide the motor
mounting plate over the studs.
NOTE:
The blower can be installed for horizontal or vertical
discharge only on HS and GS models.
2. Attach (4) nuts (included with hood) to the weld studs.
Tighten nuts to secure the blower to the hood.
3. Connect the blower's Molex plug connector to the
connector present inside the hood.
From Control Panel
Wiring the Hood with an Integral Blower
Weld Stud Locations
From Blower
English

Publicidad

loading

Este manual también es adecuado para:

Vtn1030