GB
2.
Transport, installation and operating
instructions
These instructions apply for the CEMO UNI-/MULTI-Tank 1500 l
in accordance with the general construction inspection approval
Z-40.21-432.
The CEMO UNI-/MULTI-Tanks are supplied as a unit with
an impact-proof cover of recyclable material held in place
by a shrink-wrap as protection during transportation. The
level indicator can be found in the cover on the tank side.
The tanks are fitted with a leak sensor in the works.
The cover should only be removed at the place of installa-
tion!
The approval certificate with transport, installation
and operating instructions, inspection declaration and
warranty document can be found in an envelope in a tank
connection piece.
When installing the CEMO UNI tank, the base frame must
be placed on the ground and the tank seated upon it. The
vertical alignment must be checked.
The container may then be moved to its final position and
aligned in such a way that the type plate affixed to the
front is permanently visible.
For CEMO MULTI tanks, the base frame is firmly
attached to the tank in the factory.
The tanks may only be installed in a fully enclosed room.
An additional collecting room is not required!
The tank must be installed at least 1 m from any furnaces
(fireplaces, chimneys, connecting pieces).
The tanks may not be installed in
a) passages,
b) staircases,
c) generally accessible corridors,
d) on the roofs of residential buildings, hospitals, of-
fice buildings and similar buildings or in their attics,
e) in working areas,
f) in guest rooms and bars.
Insert the level indicator in the upper connection piece.
The cap has to be removed beforehand, slide the union
nut over the indicator from below and screw the threaded
liner into place. Then fasten the level indicator by scre-
wing the union nut onto the connection piece using the
enclosed seal.
The tanks can also be connected with a fixed connection
for automatic removal via submerged-pumpsor pumps
12
with subsequent accumulator. In this case the systems
should be fitted with an automatic safety device to prevent
a siphon effect.
If operated with an automatic removal the tanks must be
adequately ventilated, e.g. through the use of an aeration
and ventilation insert (2") that can be mounted in the
existing threaded liner.
The overfill safety device with the order no. 7330 is availa-
ble as an accessory for storing non-flammable media and
the specified connection.
The leak sensor with the order no. 7391 is available as
an accessory for storing used lubricating, hydraulic or
thermal oils.
3.
Inspection declaration
Inspection declaration
for CEMO UNI-Tank / MULTI-Tank
of high-density polyethylene and galvanised sheet
steel for the unpressurised storage of media according
to the general construction inspection approval
Z-40.21-432.
Article No.:
Tank content:
Test pressure:
Approval number:
We confirm that the tank complies with the provisions
of the general construction inspection approval. The
construction and leak tests have been performed.
The Works Experts:
CEMO GmbH
7539/7881
1500 l
0.3 bar
Z-40.21-432