Fitting The Installation Kit; Drilling The Tank Shells; Assembly Of First Tank - Graf one2clean Instrucciones De Instalación

Ocultar thumbs Ver también para one2clean:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

4. Fitting the installation kit

4.1

Drilling the tank shells

1.
2700 L
3750 L
145 mm
145 mm
Drill holes for the inlet, outlet and connecting lines
on the shells using a DN 100 core drill (diameter
124 mm).
3.
On the second tank, the holes for the inlet and
outlet lines are drilled as shown above. The ar-
rows indicate the direction in which the pipe is fed
through.
4.2

Assembly of first tank

5.
H
Assemble the lower overflow baffle between the
tanks. The socket connections must be secured
using Spax screws.
4. Fitting the installation kit
H
H
4800 L
6500 L
190 mm
205 mm
Tank 2 upper shell
Tank 2 lower shell
2700 L H= 400 mm
3750 L H= 500 mm
4800 L H= 750 mm
6500 L H= 900 mm
Tank 1 upper shell
Tank 1 lower shell
On the first tank, the holes for the inlet and outlet
lines are drilled as shown above. The arrows indi-
cate the direction in which the pipe is fed through.
Deburr hole. Insert DN 100 edge seal. The feed-
through direction can be seen in the previous dia-
gram.
Insert overflow baffle in lower shell.
17 / 36
2.
4.
6.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

One2clean plus106854106855106856106857106425 ... Mostrar todo

Tabla de contenido