Electrical Connection; Filling And Venting - Buderus BUZ-Plus 15 Instrucciones De Instalación Y Funcionamiento

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 35
CAUTION: For the versions with stop and non-return
valves, these are already pre-installed and sealed with a
tightening torque of 15 Nm (hand-tight). Screwing with
excessive tightening torque destroys the valve screw con-
nection and the O ring. When installing the valve, use a
fixed spanner to prevent twisting.
4.2

Electrical connection

DANGER: Only a qualified electrician is allowed to work on
the electrical connection. Before establishing the connec-
tion, make sure that the connecting cable is dead.
Establish the electrical connection as follows:
(Fig. 7a - Fig. 7e)
Open the connector as follows: (Fig. 8)
4.3

Filling and venting

1. Fill the system
2. The pump rotor space vents automatically after a short
time in operation. This may cause noises. If necessary,
switch off and on repeatedly to accelerate the bleeding.
Dry running for short periods will not harm the pump.
4.4
Set the time (Fig. 9)
The timer of the BUZ-Plus 15 C versions can be set as fol-
lows:
1. Turn the time selection wheel (1) in the direction of the
arrow to set the current time.
2. Switch the timer on (2) and off (3) on the time selection
wheel as required.
English
17

Publicidad

Tabla de contenido
loading

Productos relacionados para Buderus BUZ-Plus 15

Este manual también es adecuado para:

Buz-plus 15 aBuz-plus 15 c

Tabla de contenido