Symbols And Descriptions - PEERLESS Vantage Manual De Instalación

Juegos de pared de bañera de fácil instalación
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

REQUIREMENTS FOR SUCCESSFUL INSTALLATION
Read complete instructions before beginning installation.
These instructions include suggestions for plumbing installation that we believe to be reliable. Local building codes
vary and could supersede those suggestions. If you are not confident in your ability to perform these tasks, contract out
those tasks you need help with or use a professional installer.
Confirm that your model will fit in intended location and plumbing fixtures are located where required before beginning
installation.
Walls and sub-floor must be solid, plumb, and square.
Use drop cloth to protect bathtub from damage during installation.
Do not install in areas where temperature may drop below 32ºF (0ºC).
Allow product to reach room temperature for 30 minutes before installation.
Two people recommended to install this product.
Wall should be 1/2" (13 mm) moisture-resistant drywall. Surfaces must be free of dirt and other residues. Painted
surfaces must be sanded.
Do not install panels over ceramic tile, plywood, or wallpaper.
Dry fit all panels before applying adhesive.
Apply adhesive to drywall using 1/4" v-notched trowel. Cover entire area behind panel.
Follow manufacturer's instructions for adhesive dry time and ventilation precautions.
Rough plumbing and bathtub must be installed before panel installation.
WALL SET INSTALLATION

1. Symbols and Descriptions

APPLY ADHESIVE
where indicated. Apply 1/4" to 3/8"
round bead.
APPLY SEALANT
where indicated.
A situation which, if not avoided, could
CAUTION:
result in property damage or other undesirable conditions.
Product damage will occur and will void the warranty.
IMPORTANT!
Instructions which, if not followed, could
result in property damage. Product damage may occur
and will void the warranty.
2. Mark Level Line
Pencil line
Measurement "Z"
(see page 2) up
from bathtub ledge
IMPORTANT!
A level line must be established to align
top of panels.
Following "Z" wall measurement (page 2), measure up from
bathtub ledge.
Draw level line to height as shown.
3
3
B27778 Rev. B 5/9/16

Publicidad

Tabla de contenido
loading

Tabla de contenido