Technical Specifications - O&O GEKO-L Manual Del Usuario

Automatizaciones a piston para portones con batiente
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

ENGLISH
2) GENERAL INFORMATION
Electromechanical operator designed to automate residential-type gates.
The gearmotor keeps the gate locked on closing and on opening, without
needing an electric lock for leaves up to 3 m long. For leaves ranging between
3m and 5m long, the electric lock becomes indispensable.
The operator is provided with an electronic torque limiter. It must be controlled
by an electronic control panel provided with torque setting.
The end-of-stroke operation is controlled by two magnetic limit devices.
The operator is provided with an obstacle detection system complying with
EN12453 and EN 12445 standards.
The following optional accessories are available on request:
- Buffer battery kit mod. KIT-BATT-BT
Allows operation of the automation even when there is no mains power
supply for a short period of time.

3) TECHNICAL SPECIFICATIONS

Power supply
Max. Absorbed power
Absorbed current
Push and pull force
Stem speed
Impact reaction
Limit devices
Manual manoeuvre
Environmental conditions
Type of use
Maximum leaf length without
electric lock
Maximum leaf length with elec-
tric lock
Max. leaf weight
Protection level
Controller weight
Dimensions
Lubrication
4)
THE ELECTRICAL PLANT SET-UP
Install the electrical system referring to the standards in force for electrical
systems CEI 64-8, IEC 364, harmonization document HD 384 and other
national standards.
5) INSTALLATION DIAGRAM Fig. B
1
rear bracket fastening to pillar
2
front fork fastening leaf
a-b distances for determining bracket "1" fastening point
C
value of fastening centre-to-centre distance
D
gate length
X
distance from gate axis to corner of pillar
S
half door thickness
Z
value always greater than 45 mm (b - x)
kg
max. weight of leaf
α°
leaf opening angle
6) PILLAR FASTENINGS INSTALLATION DISTANCES Fig. B
6.1) How to read the installation distance tables
Select "a" and "b" according to the angle in degrees α° that the gate has to open.
If there is too large a difference between "a" and "b", the leaf will not travel
smoothly and the pushing or pulling force will fluctuate during its stroke.
To respect the opening speed and ensure the controller operates correctly,
it is best to keep the difference between "a" and "b" as low as possible.
The table has been worked out for a 50 mm thick medium-size gate. Al-
ways check that there is no possible collision between the gate and the
operator.
6
INSTALLATION MANUAL
GEKO-L
24V
40 W
1,5 A
2000 N
14 mm/s approx.
Torque limiter aboard control board
Magnetic, incorporated and adjustable
Release key
- 15°C a +60°C
semi-intensive
3 m
5 m
~250 kg
IP 44
~7,7kg
See Fig. K
permanent grease
Fig. A
7) FASTENING OF FITTINGS TO PILLAR Fig. C
8) ATTACHING MOTOR TO FASTENING ON PILLAR Fig. D
9) MAXIMUM TILT Fig. E
10) CORRECT INSTALLATION Fig. F
Correct installation entails maintaining a rod stroke margin of approx. 5-10
mm to avoid possible trouble with operation.
11) FASTENING OF FITTINGS TO LEAF Fig. G
IMPORTANT: the front bracket must be fitted with the bush collar protruding
UPWARDS (Fig. F Ref. 1).
12) OPERATOR ATTACHMENT ON DOOR Fig. H
13) CLOSING LIMIT DEVICE ADJUSTMENT Fig. I
ATTENTION! To avoid braking the limit switch cable, tighten screw A keeping
the wire B well tightened (as shown in Fig. I Rif. 3).
14) OPENING LIMIT DEVICE ADJUSTMENT (Fig. J)
15) DIMENSIONS Fig. K
16) TIPS FOR SPECIAL INSTALLATIONS Fig. L, M, N, .
With the leaf fully open, create a recess to accommodate the operator.
Fig. L gives the minimum dimensions of the recess for GEKO-L models.
If distance "b" is greater than the values given in the installation tables:
- create a recess in the pillar Fig. M
- move the leaf so that it is flush with the pillar Fig. N.
17) LEAF STOPS AT GROUND LEVEL
For the actuator to work properly, it is advisable to use stops "Fig. O Rif. 1"
to stop the leaves both when they are open and closed, as illustrated in Fig.
O. The leaf stops must prevent the actuator rod from reaching the end of
its travel.
18) ELECTRICAL CONNECTIONS Fig. P
For the connection from the controller to the control board, three cables have
been provided having the following functions:
red
motor +
black
motor -
white
end-of-stroke control
Fig. P shows the wiring diagram of the LOG-GK control unit.
Should the opening or closing direction be incorrect, it is possible to invert the
connections of motor + and motor - (red/black) on the control board.
The first command after an interruption of the power supply should be an ope-
ning manoeuvre.
19) MANUAL OPENING (See USER GUIDE -FIG.Y-).
20) ELECTRIC LOCK
WARNING: In the case of leaves longer than 3m, it is indispensable
to install a solenoid latch.
For electric lock connection, the optional board is required (refer to the
appropriate instruction).

Publicidad

Tabla de contenido
loading

Productos relacionados para O&O GEKO-L

Tabla de contenido