3E4677 Gallagher S200 Solar Energizer User Manual
IMPORTANT BATTERY INFORMATION
Recharging the ba eries
Storing the energizer
Maintenance free
ba eries
Ba ery replacement
Removing the ba eries
Disposing the energizer
Disposing of the
ba eries
Switch the energizer off . Place in sunlight for 3
days with the ba eries connected OR remove the
ba eries from the energizer and charge the ba eries
for 24 hours with a 12 V 1.2 A ba ery charger in a
sheltered, well-ven lated area.
Switch the energizer off . Store in a well lit, sheltered,
well-ven lated area so solar panel keeps ba eries
charged. Recharge ba eries before and a er storage.
The ba eries must not be opened and do not require
maintenance.
Use only 12 V 7 Ah sealed, valve regulated (VRLA)
rechargeable ba eries.
Do not use the energizer with non-rechargeable
ba eries.
Switch the energizer off before removing the
ba eries.
The ba eries must be removed from the energizer
before the energizer is disposed.
Lead acid ba eries must be disposed of safely
according to local regula ons.
11 11