1
TUB - BAIN - BAÑO
5
TUB - BAIN - BAÑO
2
TUB - BAIN - BAÑO
- DRILL A 2½" [63.5mm] HOLE (MAXIMUM
DIAMETER) AND 4 x 1/2" [12.7mm] HOLES.
- PERCER UN TROU D'UN DIA. MAXIMAL DE
2 1/2" [63.5mm] ET 4 TROUS DE 1/2" [12.7mm].
- PERFORE UN ORIFICO CON UN DIÁMETRO
MÁXIMO DE 2 1/2" [63.5mm] Y 4 ORIFICIOS
DE 1/2" [12.7mm].
6
TUB - BAIN - BAÑO
CHECK
VÉRIFIER
VERIFICAR
3
15-20 TURNS
15-20 TOURS
15-20 VUELTAS
PIPE 5" MINIMUM
TUYAU 5" MINIMUM
TUBO 5" MÍNIMO
4
TUB - BAIN - BAÑO