Descargar Imprimir esta página

Maxon TE-33/GPTLR Instrucciones De Instalación página 3

El kit de bomba manual (descenso por gravedad)
Ocultar thumbs Ver también para TE-33/GPTLR:

Publicidad

Idiomas disponibles

Idiomas disponibles

LIFT CORPORATION Sht. 3 of 42 DSG#
1. Lower the platform to a comfortable
work height (FIG. 3-1). Then, use jack
under the lift frame to support the Lift-
gate (FIG. 3-1). Refer to Operation
Manual for detailed operating instruc-
tions.
WARNING
!
To prevent personal injury
and equipment damage, make
sure power is disconnected
from Liftgate while installing
hydraulic parts.
2. Disconnect power to the pump by
disconnecting negative (-) and
positive (+) cables from battery (FIG.
3-2). Reinstall nuts on negative (-)
and positive (+) battery terminals.
3. Unbolt and remove pump cover
(FIG. 3-3).
© MAXON Lift Corp. 2019
M-13-07
JACK
SUPPORTING LIFT FRAME WITH JACK
NEGATIVE (-)
BATTERY CABLE
DISCONNECTING BATTERY POWER
UNBOLTING PUMP COVER
Rev. D Date: 03/22/19
LIFT FRAME
FIG. 3-1
POSITIVE (+)
NUT
BATTERY CABLE
POSITIVE (+)
BATTERY POST
NEGATIVE (-)
BATTERY POST
FIG. 3-2
FIG. 3-3

Publicidad

loading

Este manual también es adecuado para:

287369-01