Descargar Imprimir esta página

Eaton Neo-Ray Define GYP 121 Instrucciones De Instalación página 4

Perímetro

Publicidad

Idiomas disponibles

Idiomas disponibles

7
TIE ROD
Secure fixture to structure via ¼-20 tie rod and nut as required.
Note: If desired or required, J-rail allows for up to 3/16" adjustment.
Fixture can be shimmed for a shadow reveal effect if desired.
Standard mounting is flush against wall.
9
FOR FSR ONLY: Using (2) 8-32 screws from the LED pan assembly,
install aperture guide snugly to ensure housing opening does not
open or close during installation.
11
FOR FSR ONLY: Apply a generous amount of joint compound to
fixture flange and "feather" at least 12" from fixture aperture.
Ensure compound has properly cured before removing aperture
bracket.
4
EATON
IL519013EN
APERTURE
BRACKET
REMOVED
AFTER CURE
12"
Installation instructions
8
ALIGNMENT PINS
FOR CONTINUOUS ROWS: Repeat step 2 (and 3 for FSR) to prepare
fixture. Slide fixtures together ensuring alignment pins are in
the correct position. FOR CONTINUOUS RUNS: Insert #8-32 bolt
through both fixtures. Using a 9/64" allen wrench and a 11/32"
nut driver draw fixture housings tightly together. Repeat until to
complete entire fixture run.
10
FOR FSR ONLY: Drill pilot holes along fixture(s) and through bracing
at locations shown above. One screw every 2 feet per flange is
recommended.
12
LOW VOLTAGE
DISCONNECT
With fixture securely secured in opening, reconnect the low voltage
disconnect from the driver to the LED pan assembly. Carefully tuck
all wiring back into fixture. Reinstall screws to secure pan assembly
back into housing. Reinstall acrylic diffuser and then diffuser bracket
in fixture housing.
PAN
ASSEMBLY
ACRYLIC
DIFFUSER

Publicidad

loading

Este manual también es adecuado para:

Neo-ray define fsr 121