6. Slide the long bag rod through the top of the hopper bag
along the stitched area. Attach two R-pins on each end to
secure (Fig. 5).
R-pin
Fig. 5
Long bag
rod
7. Slide the short bag rod through the bottom of the hopper
bag along the stitched area. Attach the two rod cap on
each end of the short bag rod (Fig. 6).
Fig. 6
Rod cap
Short bag rod
Stitched
area
8. Place the hopper bag assembly on the sweeper and frame
assembly by inserting the long bag rod in the two rod clips
on the handle frame, and the short bag rod into the two
openings on each side of the sweeper assembly
(Figs. 7 – 9).
Stitched
area
Hopper bag
Rod cap
5
Fig. 7
Hopper bag
assembly
Fig. 8
Long bag
rod
Fig. 9
9. Hook the plastic straps on the bag flaps under the bag
clips on the supporting legs (Fig. 10).
Handle
frame
Rod clip
Short bag
rod