Parts List; Tools Required; Installation Instruction - habitat et jardin Jesus 1293 Serie Manual Del Usuario

Tabla de contenido

Publicidad

INSTRUCTIONS. USE CAUTION WHEN USING THIS UNIT.

1. PARTS LIST

1 x BACKBOARD
1 x METAL (BASKETBALL) RING
1 x NYLON NET
6 x SCREWS (DYNABOLTS ARE RECOMMENDED FOR THIS APPLICATION,
DYNABOLTS NOT INCLUDED).

2. TOOLS REQUIRED

DRILL
10MM MASONRY DRILL BIT
LADDER
M12 SPANNER
6 x 10MM RAM PLUGS OR PLASTIC DOWELS

INSTALLATION INSTRUCTION

UNPACK ALL COMPONENTS AND CHECK FOR COMPLETENESS.
BEFORE ASSEMBLING TO WALL CHECK WITH REGISTERED BUILDER OR PROFESSIONAL
ENGINEERS THAT THE WALL IS A SUITABLE LOAD BEARING WALL.
PLACE THE BOARD IN THE REQUIRED POSITION AND MARK THE 6 HOLES THROUGH THE BOARD.
(ENSURE NONE OF THE HOLE ARE INTO THE MORTAR)
THE HEIGHT OF THE RING SHOULD BE 3.05M (10 FEET) FROM THE GROUND.
DRILL THE SIX HOLES, (55MM DEEP) WITH MASONRY DRILL.
KNOCK THE RAMPLUGS OR PLASTIC DOWELS INTO ALL HOLES.
FIT THE BACKBOARD TO THE WALL USING 2 TOP SCREWS FIRST.
FIT THE REMAINING 4 SCREWS THROUGH THE RING AND BACKBOARD.
NOTE: THE HOOKS ON THE RING MUST FACE DOWN.
HANG THE NET. THE RED SECTION OF NET TO THE TOP.
IF YOU ARE UNSURE OF ANY OF THE ASSEMBLY SEEK PROFESSIONAL ADVICE.

Publicidad

Tabla de contenido
loading

Tabla de contenido