Performance Characteristics - Zoeller 915 Instrucciones De Instalación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

1. Read all instructions before beginning installation.
2. Be certain that basin is on a firm, level surface.
3. Do not use an automatic plumbing vent device.
4. Always install the check valve on the discharge line.
5. Always provide some means, such as a union, to
disconnect the pump assembly from the basin for
maintenance purposes.
DO'S AND DON'T'S FOR INSTALLING A UNIT
1. DO read all installation material included with the pump.
2. DO inspect unit for any visible damage caused by
shipping. Contact dealer if unit appears to be damaged.
3. DO always disconnect pump from power source before
handling. DO always connect to a separately protected
and properly grounded ground fault protected circuit.
DO NOT ever cut, splice or damage power cord. DO
NOT carry or lift pump by its power cord. DO NOT
use an extension cord.
Tri-Slice
®
cutter technology - three independant cutting channels provide over 250,000 cuts/minute.
IBAD - Integral Baffling and Deflection System
minimizes potential float obstruction.
Basin Scouring System
the life of the system; no moving parts to wear out.
PUMP PERFORMANCE CURVE
30
8
25
20
6
15
4
10
2
5
0
5
GALLONS
LITERS 0
20
HELPFUL HINTS FOR EASY INSTALLATION
915 GRINDER FEATURES
®
automatically agitates standing liquid to prevent grease and sludge build up. Engineered for

PERFORMANCE CHARACTERISTICS

MODEL 915
10
15
20
25
30
40
60
80
100
FLOW PER MINUTE
© Copyright 2015 Zoeller
6. Run unit at least once a month to verify proper
operation.
7. The model number and date code can be found on
the lid warning label.
8. Plug pump into a properly grounded GFCI receptacle.
4. DO NOT use a discharge pipe smaller than the
pump discharge size.
5. DO test pump immediately after installation to be
sure that the system is working properly.
6. DO review all applicable local and national codes
and verify that the installation conforms to each
of them.
®
allows solids up to 4" to enter the basin without becoming lodged;
TOTAL DYNAMIC HEAD/FLOW
Feet
10
15
20
25
Shut-off Head:
35
40
120
140
Co. All rights reserved.
®
3
PER MINUTE SEWAGE
MODEL
915
Meters
Gal.
5
1.5
32
3.0
27
4.6
21
6.1
13
7.6
3
26 ft. (7.9m)
Liters
121
102
79
49
11
151790

Publicidad

Tabla de contenido
loading

Productos relacionados para Zoeller 915

Tabla de contenido