Descargar Imprimir esta página

RDI transform Instrucciones De Instalación página 7

Publicidad

Idiomas disponibles

Idiomas disponibles

10.
Cut the bottom rail support (component I)
to the bottom space determined in Step 2
and place it under the bottom beam at the
center point (Fig. 14).
If installing a section larger than 6', evenly
space the two rail supports along the span
of the bottom rail.
Pre-drill using a ¼" drill bit through the beam
(Fig. 15). Screw through the bottom beam
(component C) and bottom rail support
(component I) into the standing surface with
the screws provided (component L). Do not
over-tighten.
11.
The mid-baluster support is REQUIRED for
cable spans over 42"; center the support in
your cable span.
WHEN USING OPTIONAL BOTTOM RAIL
Center the mid-baluster support to the top of
the bottom rail that was cut in Step 7. Using
the mid-baluster support foot as a template
(component O), mark the hole location onto
your bottom rail. Using a 3∕
through the top of the bottom rail where you
marked.
Align your top beam and use the mid-baluster
support foot to mark holes on the top beam
and pre-drill those as well (Fig. 17).
(Fig. 14)
(Fig. 15)
Drive two pan-head screws (component
S) up from the underside of the bottom rail
to connect the mid-baluster support to the
bottom rail. Drive two pan-head screws (S)
down through the top beam to connect the
mid-baluster support to the top beam (Fig. 18).
Snap the bottom rail (component B) over the
bottom beam (component D) (Fig. 19).
" drill bit, drill
16
(Fig. 16)
(Fig. 17)
(Fig. 18)
(Fig. 19)
7

Publicidad

loading

Productos relacionados para RDI transform