RDI TITAN PRO RAIL Instrucciones De Instalación página 3

Barandal plano
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

LEVEL RAIL
1.
Determine desired rail placement and snap
a line to ensure all posts are aligned properly
(Fig. 1). Make sure sufficient mounting
structure exists in areas to receive posts.
On wood framed installations, install blocking
where necessary. Secure all posts in place
and check for plumb (Figs. 2, 3, 4, 5).
NOTE: All post kits, except blank posts,
include pre-attached level brackets,
mounting hardware, and shims. Mounting
hardware also sold separately.
Tip: Post flanges are drilled to accept four
3
/
" diameter fasteners. Use the appropriate
8
type of fastener for your installation to
insure post attachment meets the required
loads. Check local building codes for load
requirements.
(Fig. 1)
(Fig. 2)
(Fig. 3)
2.
Place bottom rail across the opening
ensuring equal baluster spacing on each end
(Fig. 6).
Mark each end ¼" from post face to allow for
bracket thickness and expansion (Figs. 7, 8).
(Fig. 4)
(Fig. 5)
(Fig. 6)
(Fig. 7)
(Fig. 8)
3

Publicidad

Tabla de contenido
loading

Productos relacionados para RDI TITAN PRO RAIL

Tabla de contenido