STEP 1
PASO 1
Parts and tools required to complete step
Piezas y herramientas necesarias para completar este paso
M8x30mm Wood Dowel x2
KK
Pasador de Madera M8x30mm
M4 ball end Allen wrench x1
Llave Allen M4 con cabeza de bola
Attach Top Front Rail (Part D), Bottom
Front Rail (Part F), Top Back Rail (Part
E), and Bottom Back Rail (Part J) to
the Left Side (Part A) using (2)
M8x30mm Dowels (Part KK),
(5) 75mm Bolts (Part CC) and (5)
Barrel Nuts (Part DD).
Use the Flat Head Screwdriver to Hold
the Barrel nuts in proper alignment
and tighten with the M4 Allen
Wrench.
14
75mm Bolt x5
CC
Perno 75mm
Flat Screwdriver – Not included
destornillador de cabeza plana – no incluid
Una la Barra frontal superior (Pieza D), la
Barra frontal inferior (Pieza F), la Barra trasera
superior (Pieza E) y la Barra trasera inferior
(Pieza J) al Lado Izquierdo (Pieza A) con
ayuda de (2) Pasadores M8x30mm (Pieza
KK), (5) Pernos 75mm (Pieza CC) y (5) Tuercas
cilíndricas (Pieza DD). Utilice el destornillador
de cabeza plana para sostener la tuerca de
barril en la alineación adecuadaApriete
todos los pernos con la Llave Allen.
Barrel Nut x5
DD
Tuercacilíndrica