Price Pfister RT6 Serie Manual Del Usuario página 3

Juego con acabado para la tina romana de 4 agujeros
Ocultar thumbs Ver también para RT6 Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

THICK WALL INSTALLATION
6
6F
6D
6E
6 DIVERTER INSTALLATION
From above deck, place Washer (6A) and slide and thread Diverter Body (6B) into Main
Body (6C). Be sure to position Diverter Body (6B) with Set Screw Hole (6D) facing
tub. Secure Diverter Body (6B) with Set Screw (6E). Thread Rod (6F) into Diverter
Body (6B).
7
7 SPOUT INSTALLATION
Assemble and align Quick Connect Spout (7A) onto Diverter Body (7B) and tighten Set
Screw (7C). Place Button (7D).
STOP
6B
6A
6C
7A
7D
7C
7B
Go To Step 10
ENGLISH
THIN WALL INSTALLATION
8
8 SPOUT INSTALLATION
Assemble and align Quick Connect Spout (8A) onto Diverter Body (8B) and tighten Set
Screw (8C). Place Button (8D).
9
9A
9 KNOB INSTALLATION
Place Knob (9A) onto Diverter Stem (9B) as shown. Make sure Knob (9A) is securely
tighten to Diverter Stem (9B).
For pressure testing: Seal Spray Hose (9D) with Plug (9E) (Supplied with Rough-In
0X6-44). Run water and perform pressure test. Look for leaks.
WARNING: Pressure testing is not to exceed 250 PSI (1724 kPa). Make sure
pressure is balanced between hot and cold inlets.
WARNING: Differential pressure of hot and cold inlets must not exceed 100
PSI (689 kPa).
CAUTION: Slowly remove Plug (9D) to relieve pressure.
3
8A
8D
8C
8B
9B
9E
9D

Publicidad

Tabla de contenido
loading

Tabla de contenido