G G
B B
TECHNICAL
DATA
Max. boom lenght
Opening time
Max. torque
EEC Power supply
Capacity
Power absorbed
EEC Power supply
Capacity
Power absorbed
Normative cycles
D aily operations suggested
Service
Guaranteed consecutive cycles
Weight of electroreducer
Working Temperature
Protection
PRESIDENT ASSEMBLY
A
SSEMBLY PLATE TO CEMENT
- Screw down the four bars bent over the plate to cement by using the
washers and the screw nuts supplied with an hexagonal setscrew
wrench no. 19 as shown in figure 1-2.
ATTENTION: Position the plate to cement keeping attention that it is
laid down perfectly flat and that the point mark is turned
towards the exact position where you want the rod to
come down.
- Once you have cemented the plate, screw down the three long
threaded bars by clamping them energetically with a pliers as
shown in figures 3-4-5-6.
A
SSEMBLY OPERATOR SUPPORT COLUMN
- After having screwed down the bars and having pulled the electric
cables for the connections, insert the tube CCA1289 and lean on it the
operator support plate CCA1281. Pull the electric cables up to the top
of the operator support plate as shown in figures 7-8-9.
- Screw down the support plate using the washers and the screw nuts
supplied with a hexagonal setscrew wrench no. 17 as shown in figures
10-11-12.
O
PERATOR FIXING ON THE COLUMN
- Lean the operator on the support plate and fix it by tightening with a
socket head no. 6 the 4 screws supplied as shown in figures 13-14-
15.
R
EMOVAL ROD RACK OPERATOR HUB
- Remove the hub-cap with a screw no. 5 (Fig. 16).
- Remove the security plate by screwing off the four screws with an
hexagonal setscrew wrench no. 10 (Fig. 17-18).
- Screw off the two screws which block the hub with a screw no. 8 and
remove it from the operator (Figures 19-20).
PRESIDENT
m
3
4
s
3
3,5
Nm
100
130
230V~ 50/60Hz
W
74
A
0,320
120V~ 60Hz
W
72
A
0,6
N°
∞ - 3s/2s
N°
600
100%
N°
600
kg
40
°C
-10 ÷ +55
IP
44
Components to install according to EN12453 standards
COMMAND TYPE
with manned operation
with visible impulses (e.g. sensor)
with not visible impulses
(e.g. remote control device)
automatic
* a typical example are those shutters which do not have access to any public way.
A: Command button with manned operation (that is, operating as long as activated), like code
ACG2020.
B: Key selector with manned operation, like code ACG1010.
C: Built-in Encoder (operating as thrust limitation device, within the limits indicated by specification
EN12453 - Appendix A).
D: Built-in Encoder (operating as presence detector).
A
SSEMBLING OF THE 3 mt TELESCOPIC ROD
- Assemble the telescopic rod fitting the three legs together, until the
screws holes are aligned (Fig. 21-22).
- Secure the Ø 60 leg to the Ø 55 leg with the allen screw 6x70, the
two washers and the self-locking nut. Tighten by means of an allen
key n° 5 and an exagonal key n° 10.
- Secure the second leg to the third leg with the outfit screws and insert
the end cap into the rod (Fig. 23).
Note: in case the rod needs to be shortened, DO NOT CUT THE ROD,
NOR REMOVE A LEG. Slide the end leg into the middle leg to obtain
the required overall length, and retighten by means of the outfit screws.
Obviously the leg will need to be drilled Ø 5 at its end, and threaded
M6 to provided new seats for the outfit screws. The rod can be
shortened up to 2 mt without need for balancing.
A
SSEMBLING OF THE 4 mt TELESCOPIC ROD
- Assemble the telescopic rod fitting the 4 legs together, until the screws
holes are aligned (Fig. 21-22).
- Secure the Ø 60 leg to the Ø 55 leg with the allen screw 6x70, the
two washers and the self-locking nut. Tighten by means of an allen
key n° 5 and an exagonal key n° 10.
- Insert the other legs and secure by means of the outfit screws. Insert
the end cap into the end leg (Fig. 23).
Note: in case the rod needs to be shortened, DO NOT CUT THE ROD,
NOR REMOVE A LEG. Slide the end leg into the middle leg to obtain
the required overall length, and retighten by means of the outfit screws.
Obviously the leg will need to be drilled Ø 6, 5. The rod can be
shortened up to 3,5 mt without need for balancing .
In case a length ranging from 3 to 3,49 mt is required, re-balancing of
the rod is necessary.
To re-balance the rod detailed instructions should be obtained from the
address
HYPERLINK "mailto:ribind@ribind.it" ribind@ribind.it or
USE OF THE BARRIER
Skilled persons
Skilled persons Unrestricted use
(out of a public area*)
(public area)
A
B
C
C
C
C and D
C and D
C and D
C and D
C and D
C and D