Erreka VIVO-T101 Instrucciones De Instalación página 6

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 15
VIVO-T101
Power supply and operator connections
Z
3x400V Facilities
(400V
between
connect the three phases to the
cable connectors R, S and T, and
the neutral to cable connector N.
O
In 3x400V facilities the
neutral must be connected
to the N cable connector, in
order
to
damage to the control
board.
Z
3x230V Facilities
(230V
between
connect the three phases to the
cable connectors R, S and T, and
bridge the cable connectors N
and R.
DL4
DL5
PUL1
PUL2
SW1
SW2
M
U, V, W operator motor connections
PE
F1
F2
F3
Z
When pressing PUL1 (close), DL5 lights up and the G2 and G3 cable connectors are activated.
Z
When pressing PUL2 (open), DL4 lights up and the G1 and G3 cable connectors are activated.
Turning direction check
Press PUL1 (open) and PUL2 (close) to check the turning direction of the operator. If it is not
correct, interchange connections V and W.
Fig. 1
Power supply and operator connections
6
Installation instructions
phases):
P1 P2 P3
prevent
any
ST1
phases):
PE
open indicator
close indicator
close mini-pushbutton
open mini-pushbutton
power supply switch
Programming DIPs
three-phase operator motor
earth connection
R line fuse (6.3 A)
S line fuse (6.3 A)
T line fuse (6.3 A)
P4 P5 P6
P15 P14 P16
P7 P8
P11 P12
P22 P23
24Vac
LOCK
FT1
ST2
FT2
FCA1
FCC1
STOP
3
Connections between plates
G1
open
G2
close
G3
common (COM)
NN
single phase plate power supply
neutral
S-L
single phase plate power supply line
DL5
DL4
G1
G2
G3
G7 G8
G9 G10
Courtesy
Lamp.
MOTOR1 (G2-G1-COM)
Light
F1 F2 F3
N
S
N
L
POWER
P227W

Publicidad

Tabla de contenido
loading

Tabla de contenido