BOERBOEL EPN-5069 Instrucciones De Instalación página 4

Bisagra de mariposa estándar, compacta y de alta resistencia
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Install Latch Arm Guide:
4
a.)
On the side of the post which faces the gate, move
the latch arm so it will rest beneath the latch arm
guide. Measure and mark 1
bottom of the latch base, and approximately 1
from the edge of the post (Fig. 6).
b.) Align the top and side of the latch arm guide with
the measured marks (Fig. 6).
c.)
Mark and drill two pilot holes using a
(Fig. 6).
d.) Secure the latch arm guide with two 1
(Fig. 7).
To Reconfi gure for Left-Side Mounting:
a.)
Unscrew the small screw and lock nut, which
connects the latch arm and the latch lock arm
(Fig. 8).
b.) Flip the latch lock bracket in the opposite direction,
so that the bent portion of the bracket and the
Boerboel
the bend in the latch arm is now facing to the right
(Fig. 8).
c.)
Using the small screw and lock nut, secure the
latch arm to the bottom hole in the latch lock arm
(Fig. 8).
d.) Follow "Installation" steps 3 and 4 for installing the
latch.
4
⁄ " down from the
1
1
1
logo is facing to the left. Be sure that
®
2
2
⁄ " in
1
1
1
2
2
⁄ " drill bit
3
3
3
32
32
⁄ " screws
1
1
1
4
4
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
1-1/2"
Mark and drill
Mark and drill
pilot holes
pilot holes
Latch arm guide
Latch arm guide
Latch arm guide
Latch arm guide
Latch arm guide
Latch arm guide
Finished Installation
Fig. 6
Latch arm
Latch arm
Fig. 7
Fig. 8

Publicidad

Tabla de contenido
loading

Productos relacionados para BOERBOEL EPN-5069

Tabla de contenido