Ac And Dc Power Connection; Booting The N3132Px-On Switch - Dell Networking N2128PX-ON Guía De Introducción

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Figure 1-9. Two Redundant Power Supplies on N3132PX-ON

AC and DC Power Connection

1 Make sure that the switch console port is connected to a VT100 terminal
or VT100 terminal emulator via the RJ-45 to DB-9 female cable.
2 Using a 5-foot (1.5 m) standard power cable with safety ground connected,
connect the power cable to the AC main receptacle located on the rear
panel.
3 Connect the power cable to a grounded AC outlet.

Booting the N3132PX-ON Switch

When the power is turned on with the local terminal already connected, the
switch goes through a power-on self-test (POST). POST runs every time the
switch is initialized and checks hardware components to determine if the
switch is fully operational before completely booting. If POST detects a
critical problem, the program flow stops. If POST passes successfully, valid
firmware is loaded into RAM. POST messages are displayed on the terminal
and indicate test success or failure. The boot process runs for approximately
60 seconds.
You can invoke the Boot menu after the first part of the POST is completed.
From the Boot menu, you can perform configuration tasks such as resetting
the system to factory defaults, activating the backup image, or recovering a
password. For more information about the Boot menu functions, refer to the
CLI Reference Guide.
To AC Power Source
Getting Started Guide
37

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Networking n3132px-on

Tabla de contenido