Wiring Diagram - Utilitech 7105-06 Manual Del Usuario

Ventilador decorativo con luz led
Ocultar thumbs Ver también para 7105-06:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

PREPARATION
Estimated Assembly Time: 60 minutes
Tools Required for Assembly (not included): Hammer, Flathead Screwdriver, Duct Tape, Phillips
Screwdriver, Utility Knife
Helpful Tools (not included): Electric Drill, Drill Bits
WARNING: Turn off electricity at breaker box before beginning installation.
Carefully remove unit from carton.
Check area above installation location to be sure that wiring can run to the planned location and that
duct work can be run and the area is sufficient for proper ventilation.
Inspect duct work and wiring before proceeding with installation.
Before installation, provide inspection and future maintenance access at a location that will not interfere
with installation work.
You may need the help of a second person to install this fan: one person on the attic side and one on
the room side.
Note: Installations may vary depending on how the previous bath fan was installed. Supplies necessary
for the installation of your bath fan are not all included; however, most are available at your local
home improvement or hardware store.
DIMENSION REQUIREMENTS
Ceiling
Opening (L)
Opening (W)
9 in.

WIRING DIAGRAM

Ceiling
Ceiling
Opening (H)
9 in.
6 in.
QUICK CONNECTOR INSTRUCTIONS
To be sold only with installation instructions.
WARNING: Wiring must comply with all appliable
electrical codes. Turn OFF power before removing or
installing connectors.
WARNING: COPPER TO COPPER ONLY. Do not use
aluminum wire.
CAUTION: Accessory part (quick connector) should
meet installation instructions below.
NOTE: The connector is reusable on solid wires of the
same wire gage or smaller. Do not reuse the connector
on stranded wires.
• Strip wires 3/8 in. - 1/2 in.
• Grip the wire firmly and push the stripped end of the
wire into the open port of the connector. Use only one
conductor per port.
• Verify the stripped end of the wires is fully inserted to
the back of the connector.
House
wires
NOTE: Important wire information. Maximum temperature
rating 221˚F (105˚C). 600 volts maximum for building wire
and 1,000 volts maximum for building wire and 1,000 volts
maximum in signs and lighting fixtures.
The acceptable wire range includes: Solid: 12-18 AWG.
5
Quick
connect
Product
wires

Publicidad

Tabla de contenido
loading

Tabla de contenido