Descargar Imprimir esta página

Typical Installation; Important - NuTone HLB3 Manual De Instrucciones

Publicidad

Idiomas disponibles

Idiomas disponibles

TYPICAL INSTALLATION

MOUNTING (New Frame Construction)
10" ROUND DUCT
ADDITIONAL
1 ½" FRAMING
Blower
factory-
shipped
in straight
through
discharge
position.
Mounting brackets factory-
shipped in position for
½" ceiling material.
Factory-shipped unit installed in new construction.
MOUNTING (Existing Frame Construction)
8" TO 10" ROUND
TRANSITIONS
10" ROUND DUCT
(OUTLET)
CEILING JOIST
(16" centers
shown)
MOUNTING
BRACKETS
(Attached to
opposite sides
of housing &
upside-down)
Blower factory-shipped in straight-through
discharge position.
IMPORTANT: Remove shipping tape from damper
Remove the shipping tape from the damper flap and make sure
that damper flap opens and closes freely inside the ductwork. Use
duct tape to make ductwork connections secure and air-tight.
Remove shipping ring from blower inlet
Remove the shipping ring from the blower inlet before operating
the ventilator.
8" TO 10" ROUND
TRANSITIONS
10" ROUND
DUCT
CEILING JOIST
(16" centers
shown)
MOUNTING SCREW
10" ROUND
DUCT
(INTAKE)
2 x 4 FRAMING
(wide side down)
TYPICAL INSTALLATION
MOUNTING USING HANGER KIT (included)
HANGER
KIT CHAIN
HANGER KIT
EYE-BOLT
8" TO 10"
ROUND
TRANSITIONS
10" ROUND
DUCT
(OUTLET)
ACCESS PANEL
Blower factory-shipped in straight-through
discharge position.
DUCTING (Horizontal blower discharge)
ROUND DUCT
Two ways to connect ductwork to a factory-shipped unit.
HANGER
KIT BOLT
& WASHER
EXTENSION
SPRING
10" ROUND
DUCT (INTAKE)
HANGER
KIT NUT &
WASHER
MOUNTING
BRACKET
GRILLE NUT
(Install into
square holes in
housing)
ACCESS
PANEL SCREW
ROOF CAP
ROUND
ELBOW
Page 2
WALL
CAP

Publicidad

loading