Package Contents - Zoeller 1263-0001 Manual Del Usuario

Bomba para aguas negras
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

CAUTION
PRODUCT DAMAGE MAY RESULT.
Make certain that the power source conforms to the requirements of your equipment.
PRODUCT DAMAGE MAY RESULT.
Maximum continuous operating water temperature for standard model pumps must not exceed
104°F (40°C).

PACKAGE CONTENTS

Description
Pump
PREPARATION
Before beginning installation of product, make sure all parts are present. Compare parts with package
contents list. If any part is missing or damaged, do not attempt to assemble the product.
Estimated Installation Time: 2 hours
Tools Required for Assembly (not included): Adjustable wrench, hacksaw, flathead screwdriver,
Phillips screwdriver, tape measure, utility knife, pipe wrench.
Parts Required For Assembly (not included): sewage pump basin minimum 18 in. w x 30 in. deep,
basin cover, basin gasket, 2 in. check valve, 2 in. union, gate valve or ball valve as required by codes, 2
in. Sched 40 PVC pipe, 2-step PVC glue system (primer and sealer), cable or zip ties.
Quantity
1
CAUTION
3
© 2020. All rights reserved.

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido