4. Installation and Initial Startup
NOTE: Before installation, please inspect the unit. Be sure that nothing inside the
package is damaged.
Placement & Storage Conditions
Install the UPS in a protected area that is free of excessive dust and has adequate air
flow. Please place the UPS away from other units at least 20 cm to avoid interference.
Do NOT operate the UPS where the temperature and humidity is outside the specific
limits. (Please check the specs for the limitations.)
Connect to Utility and Charging
Before initial use, please plug in the AC input cord to the wall
outlet and turn on the UPS for charging. For the best results,
suggest to charge the battery at least 8 hours before initial
8 hours
use.
Connect the Loads
Plug in the loads to output receptacles on the rear panel of the UPS. Simply turn on the
power switch of UPS unit, then devices connected to the UPS will be protected by UPS
unit.
Turn On/Off the Unit
Turn on the UPS unit by pressing the power switch. Turn off the UPS unit by pressing
again the power switch.
2