5. SqUArInG UP THe FrAMe
A. Place frame in its final location, which
needs to be as flat and level as possible.
B. Measure across opposite corners. These
distances must be equal to within 1".
C. Check that the front and rear of the frame
measures 10' in width.
6. ProPerlY AncHor THe FrAMe
WARNING: Serious injury to persons or property could result if cover is installed and
shelter is not anchored and is left unattended. Shelter MUST be securely anchored.
A. Anchors must be placed inside shelter at the corners of the shelter.
B. Insert a ¾" pipe or steel rod, through the eyelet of the auger and screw the anchor into the ground until the
eyelet is sticking out of the ground by 1-2" so it can be anchored to the legs.
If ground is too hard, dig a hole with a shovel or post hole tool. Optional: Fill with cement.
C. Wrap cable provided through the eyelet of the anchor and around the frame as shown below. Secure
the cable with the clamps provided.
10'
NOTE:
15" Augers are for temporary use only!
For best results ShelterLogic recom-
mends using our Easy Hooks (#10036
4-pack, #10035 6-pack, or #10038
8-pack) or 30" Augers (#10075 4-pack,
#10078 6-pack, or #10079 8-pack) for a
End Rib Anchors
Page 6
stronger, more secure
installation.
Call 1-800-524-9970
or visit
www.shelterlogic.com
for more information.
05-62681-0A