INSTALLATION INSTRUCTIONS
STEP F
1. Place the vertical seal strips (I) on the panel (B & C).
2. Cut the strips (I) to fit the door size.
3. Place the vertical seal strip (J) on the door (C).
4. Place the metal seal strip (N) and the clips (O) in front of the door (C).
1
I
B
2
B
C
G
D
G
C
I
C
B
13
3
J
C
4
N
O