Cover Removal, And Installation; Cable Installation - Preparation - Leviton Opt-X HIGH DENSITY SYSTEM 1000i Instrucciones Para Usar

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

COVER REMOVAL
To remove cover: Push tabs down, and
then slide the cover out.
CABLE INSTALLATION - PREPARATION (SLIDING TRAY)
Top View: Tray to Front
NOTE: Tray in forward position, covers
and center bar removed for clarity.
DI-007-5RXUM-20A
DOOR LATCH
To open the door: Lift tabs as shown
CABLE GROMMET
NOTE:
Cutting beyond the pre-determined cutting
guides or through the grommet edge may cause
deformation of the grommet and decreased retention
capability.
COMMENTS:
• Route cable to tray through grommet on the opposite
side of slide tray tie down point
• Assure cable slack for tray movement.
• Recommended trunk breakout length is 36 inches
• 20 inches of breakout is required from the first tray lancing
point to provide adequate slack for individual cassette
travel.
• A minimum of 14 inches of free slack is required to each
cassette for bend radius compliant accessibility from the
front side.
NOTE:
• To remove tray from enclosure, slide tray fully forward
• (Warning: No front pin/rear stop point is provided with this
enclosure.)
Pictured: Removable tray to facilitate field
termination.
Caution:
If grommet needs
to be cut, cut at an
angle towards the
center and on the
inside of the grom-
met only.
Page 5 of 27

Publicidad

Capítulos

Tabla de contenido
loading

Productos relacionados para Leviton Opt-X HIGH DENSITY SYSTEM 1000i

Este manual también es adecuado para:

5r1um-s085r2um-s16

Tabla de contenido