FOUNDATION OPTIONS
YOU MUST ASSEMBLE YOUR BUILDING ON A
WOOD FLOOR OR CONCRETE SLAB.
SITE PREPARATION
• Site must be properly leveled.
• Site should have natural drainage
and no standing water
A) Building the optional wood floor
frame.
TO CONSTRUCT THE WOODEN FLOOR FRAME
, BEGIN ON THE PAGE 4.
Building Size
Dimensiones del edificio
10'x 7'8-5/8" (305 x 235cm)
10'x 11'8-5/8" (305 x 357cm)
10'x 15'8-5/8" (305 x 479cm)
Important: Square floor and level to ground
before beginning assembly of building.
B) Concrete Slab Foundation
Soleras Inferiors Tratadas
Building Size
Dimensiones del edificio
10'x 7'8-5/8" (305 x 235cm)
10'x 11'8-5/8" (305 x 357cm)
10'x 15'8-5/8" (305 x 479cm)
Fasten treated 2x4 sill plates to slab using approved
concrete anchors. (Fasteners not included.)
Cut treated 2x4 sill plates to length
A A
A
B
120" (305 cm) 89-5/8" (228 cm)
A
A
A
120" (305 cm) 137-5/8" (350 cm)
120" (305 cm) 185-5/8" (471 cm)
Treated Sill
A
A A
A
B
120" (305 cm) 85-5/8" (217 cm)
A
A
A
120" (305 cm) 133-5/8" (339 cm)
120" (305 cm) 181-5/8" (461 cm)
OPCIONES PARA LA CIMENTACIÓN
HAY QUE CONSTRUIR EL EDIFICIO SOBRE UN BASE
DE MADERA O DE CONCRETO.
PREPARACIÓN DEL SITIO
• El sitio debe de estar nivelado correctamente.
• Instale una barrera contra yerbajos debajo de la
estructura.
A) El edificio del marco de suelo de madera
opcional.
PARA CONSTRUIR EL MARCO DE PISO DE
MADERA , COMIENCE EN LA PÁGINA 4.
A
C
92-5/8" (235 cm)
140-5/8" (357 cm)
188-5/8" (479 cm)
Importante: Asegure que el suelo está nivelado y
escuadrado antes de construir el edificio.
B) Base en losa de concreto
3-1/2"
(8.9 cm)
C
92-5/8" (235 cm)
140-5/8" (357 cm)
188-5/8" (479 cm)
Fije las soleras inferiores tratadas, de tamaño 2x4, a la losa
usando anclajes de concreto aprobados. (Los anclajes no
están incluidos.)
Corte los tableros tratados 2x4 a longitud
5
B C
B
C
4"
(10 cm)