Equipment Description; Installation; Location; Connections To The Mains - Selecta HPC PL-3 Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

MANUAL DE INSTRUCCIONES
2
J
.P. SELECTA s.a.u.
CODIGO 80394 REV 0

4. Equipment Description

HPC PL-3 dry air defroster allows defrosting of up to 400ml bags through a stream of
hot air and a gentle agitation. Bags are placed in perforated trays inside a removable
tray to facilitate cleaning in case of bag leaks.

5. Installation

Unpack the equipment and visually check that the contents are in good conditions.
Keep the package for some days.

5.1 Location

Place the equipment on a flat level stable surface, suitable for the equipment weight.
To work in a comfortable way, please leave a free space of 50cm around the equipment
and a minimum of 20cm at the rear part.

5.2 Connections to the mains

Plug the equipment to a near socket suitable for the equipment power. Use the con-
nection cable supplied or a similar one.
For your safety, the equipment must be earthed.
Before plugging the equipment, check that the voltage supply and the frequency
corresponds to the one indicated in the equipment characteristics plate.
If you change the plug, bear in mind the following:

6. Operation

6.1 Elements identification

1
3
Autovía A-2 Km 585.1 Abrera 08630 (Barcelona) España
e-mail: selecta@jpselecta.es - http://www.grupo-selecta.com
Blue cable:
Brown cable:
Yellow/Green cable:
1. Access cover to the tray
2. Control screen
3. USB connector
4. IR temperature reader
04/2020
Neutral.
Phase.
Earth.
4
Tel (34) 93 770 08 77 Fax (34) 93 770 23 62
Pag.: 9

Publicidad

Tabla de contenido
loading

Tabla de contenido