AB Quality SLC 5/03 Instrucciones De Instalación página 10

Ocultar thumbs Ver también para SLC 5/03:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 51
10
SLC 5/03™, SLC 5/04™, and SLC 5/05™ Modular Processors
3. Unplug the battery connector. Refer to the figure below for battery
connector location.
Battery
Battery Connector
IMPORTANT
4. Remove the battery from the retaining clips.
5. Insert a new battery into the battery retaining clips.
6. Plug the battery connector into the socket as shown above.
7. Re-insert the module into the SLC 500 chassis.
8. Restore power to the SLC 500 power supply.
9. Close the processor door.
IMPORTANT
Publication 1747-IN009D-MU-P - November 2003
The SLC 5/03, 5/04, and 5/05 processors have a capacitor that
provides at least 30 minutes of battery back-up while the battery
is disconnected. Data in RAM is not lost if the battery is replaced
within 30 minutes
See page 13 for information on proper battery handling,
storage, and transporting.
Left Side View

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Slc 5/04Slc 5/05

Tabla de contenido