TGM 7K Instrucciones De Instalación página 15

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation instructions
How to Purge Air Tubes:
(1). Unscrew and remove caps from 2 and 3-way valves.
(2). Unscrew and remove cap from service valve.
(3). Connect vacuum pump flexible hose to the service valve.
(4). Start vacuum pump for 10-15 minutes until reaching a vacuum of 10 mm Hg absolutes.
(5). With vacuum pump still running close the low pressure knob on vacuum pump manifold. Then stop
vacuum pump.
(6). Open 2-way valve 1/4 turn then close it after 10 seconds. Check tightness of all joints using liquid
soap or an electronic leak detector.
(7). Turn 2 and 3-way valves stem to fully the valves. Disconnect vacuum pump flexible hose.
(8). Replace and tighten all valve caps.
13

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

18k21k25k30k36k

Tabla de contenido